OPEN AS USUAL

We are doing all we can to protect employees and customers, and will endeavour to keep things running as smoothly as possible throughout this difficult time. Our delivery install service is running as normal.

Should you have any requirements now or for future projects, please contact us: 0116 2695050 or email info@automaticaccess.co.uk.

Thank you and stay safe.

Archives: Case Studies

Rodin Cars

Rodin Cars

Representing the lifelong vision of founder David Dicker, the Rodin Cars project was officially launched in 2016. Rodin Cars’ commitment to excellence, high-precision engineering and high-performance components has been developed into an ambitious vehicle, with a V10 engine, that has been adapted to lap a circuit faster than a Grand Prix Formula 1 car. Donnington Park

Read More

Automatic Door Installation: Syston Voluntary Centre Leicestershire

Focused on recruiting and placing volunteers, providing appropriate support, developing new ideas and opportunities for bringing the community together, and establishing close links with other statutory and voluntary organisations who could assist in those tasks; Syston and District Volunteer Centre has been providing a range of services to meet the needs of the local community, but

Read More
Buxton Crescent

Buxton Crescent

© David Seale / The Crescent, Buxton / CC BY-SA 2.0 Facing the site of St Ann’s Well, where warm spring water has flowed for thousands of years, grade two listed building Buxton Crescent had been closed for 25 years. It took 17 years after work began to bring the grand old hotel back to

Read More

MV Britannia

Part of the P&O Cruises fleet, MV Britannia was built by Fincantieri at its shipyard in Monfalcone, Italy. At 143,000 GT, Britannia is the largest of six ships currently in service with P&O Cruises – she is also the flagship, taking the honour from Oriana. Automatic Access Ltd. was approached to retro fit automatic doors

Read More

King Edward’s School – Birmingham

Founded in 1552, King Edward’s School is part of the Foundation of the Schools of King Edward VI in Birmingham. Automatic Access Limited installed automatic doors to an entrance within the school’s premises. The existing doors were high quality wooden doors with an arched top: the school wanted a secure access-controlled door to prevent unauthorised

Read More
Page 1 of 4
1 2 3 4